Projects - Fiontar Group
Banner

Our Health, Safety, Environmental & Quality Experience.

If you want to learn more about the role Fiontar Group played in each of the below projects or require any of our services, please do not hesitate to contact us on the numbers below or through the form below

  • All projects

Shelbourne Road

This project involves a fit out of 2 floors to the commercial office building including –

Floor 5 – Existing Cat B fit out refurbs works

Floors 6 – Existing CAT A grey box to be completely fitted out to CAT B office finish.

Fiontar Group Role: PSCS

WeWork Aviation House

The works involved the fit out of the 7th floor of the building to the client specification to create a modern collaborative working environment. This project also included the removal of glass partitions to create an open office. Other works included electrical and data cabling, decoration, and floor works.

Fiontar Group Role: Principal Contractor Support and Principal Designer

Triton Square

This project involved the fit out of an existing head office accommodation to a mid to high specification office.

The project included:

The creation of office space from 3rd to 6th inclusive.

The creation of executive suite to the 6th floor.

Santander entities on floor 3-6.

Relocation of trade from floor 1 to 5.

Provision of Cat A standard environment on floor 1 and 2 for future development.

Fiontar Group Role: Principal Contract Support

Blanchardstown Data Centre

Construction of 3 no. data hall buildings with ancillary offices, staff areas, front and back of house areas, entrance lobbies, toilets, storage, associated plant throughout, photovoltaic panels and screened plant areas at roof levels. The proposed data hall buildings range from 1-3 storeys including front of house areas at a 4th floor level serving Building 3.

Clonee Data Centre

Our client is providing fibre and copper interconnects between existing Data Halls and General Service buildings to the newly constructed Data Centre building.

Titanic Museum Belfast

Fit-out of a major new exhibition centre dedicated to the story of the Titanic. This complex project was carried out over 9 different levels involving over 100 contractors from across the UK. The project was the largest of its kind in Northern Ireland and finished with no LTA’s to report which was a massive achievement for the project and Fiontar Group team.

Fiontar Group Role: Health, Safety, Environmental, Quality & Security Advisory Consultants

HMS Caroline

Fiontar Group managed all Health, Safety, Environmental & Quality requirements of the full fitout of the HMS Caroline in Belfast., Northern Ireland. This covered all requirements to ensure full legal compliance.

The fitout works were carried out onboard the ship and included management of all risk, traffic management and control, lifting operations and CDM compliance.

Fiontar Group Role: Health, Safety, Environmental, Quality & Security Advisory Consultants

Museum of Liverpool

A £12m extensive fit-out at the new waterfront attraction in Mann Island commissioned by National Museums Liverpool. 

Fiontar Group Role: Health, Safety, Environmental, Quality & Security Advisory Consultants

Diriyah Gate Cultural Assets

Creating a new gathering space for the world in Saudi Arabia’s ancient capital.

Diriyah Gate is a US$20bn cultural and lifestyle development in Riyadh, Saudi Arabia. This world-class heritage destination celebrates Diriyah as the nation’s symbolic birthplace and reveals its rich, vibrant and storied past.

Fiontar Group Role: Health, Safety, Environmental, Quality & Security Advisory Consultants

Citywest Business Campus

The project involves a fit out of a 3 floor commercial office building including existing Cat B fit out refurb works to the office and the restaurant.

Fiontar Group Role: PSDP

40 Molesworth Street

The project involves fit out of 4 floors of a modern commercial office building including working floors with open plan offices, meeting rooms, client rooms, staff social areas and kitchens.

Fiontar Group Role: PSDP

Block F1 Cherrywood, Dublin

Fit out of a 6 floor building to create of a modern workspace to reflect US Banks status as a world leader of the global payment provider industry. The fit out is designed to encourage an open and collaborative fashion ensuring a balance between aesthetics and functionality. The fit out includes space for both internal and external client meetings and for several distinct departments within US Bank

Fiontar Group Role: PSDP

Factory Redevelopment

This project included the 3 storey split level extension to the south-west of the existing factory, providing new offices,​ canteens, conference, training and collaboration rooms, changing area and welfare facilities for staff. The project also includes​ the redevelopment of the existing supply chain and extension of the visitor car park.​ The development also includes the demolition of a sectional building within close proximity to the main factory.

Tib Street Manchester

This amazing open plan design is second to none in retail spaces and when it opens to the public the store will house over thirty grand and upright pianos. A recital area, five practice rooms, lounge areas and offices all with a bespoke modern finish.

Fiontar Group Role: Principal Designer & Principal Contractor

Barley Mow Centre

Transformation of a Victorian era building into a modern, inspirational and vibrant workspace. Some amazing spaces, details and areas were revealed and restored. The latest technology, and design innovations were implemented throughout. The result is a spacious, bright modern industrial vibe that also retains the character of the original building, now brought fully back to life. The building has been transformed to provide a diverse range of spaces for growing companies. 

Fiontar Group Role: Principal Designer & Principal Contractor

Bonham Quay Galway

The works at Bonham Quay consists of 6 floors of workplace fitout. Level 1 is the conference floor with meeting rooms and café area. Level 2-6 are typical working floors with open plan office, meeting rooms and a tea point.

Fiontar Group Role: PSDP

Earlsfort Terracе, Saint Kevin’s, Dublin 2

The final proposals for the hotel include:​
Increasing existing key count from 192keys to 280keys via creation of new 8th floor rooftop extension and new guestroom​
block and reconfiguration of existing keys within existing demise.​
Demolition of existing ballroom/laundry wing and creation of a new triple height Multi- Use Event Space.​
Consolidation of F&B at ground and lower ground floor including new rooftop bar at 7th and 8th floors with direct street​
access.​
Creation of a new 3 level Wellness facility & upgrading the Architectural quality of the building through Façade replacement.

Fiontar Group Role: PSDP

The Maldron Hotel

This project consisted of refurbishment works to the existing Maldron Hotel, Pearse Street Dublin 2.​
The project included the complete remodelling of the Hotel internally and externally and included for the construction of a block of apartments at the back of the hotel. 

Fiontar Group Role: PSDP

70 St Stephens Green

Project Details:

6 Floor Fit out of a new Cat A and Client fit out of offices located in 70 St. Stephens Green, Dublin 2, Ireland.​ Fiontar Group took account of all PSDP duties throughout the Design, Tender, Construction and Close Out phase of the project in line with Safety, Health, & Welfare at Work (Construction) Regulations 2013 & (Amendment) Regulations 2019.

Fiontar Group Role: PSDP