Bottleworks site specific induction

Bottleworks Site Specific Induction

  • 1. Project description

The phased fit out of interior office space at basement, lower ground, ground, 1st and 2nd floor levels at Bottleworks, 15 Barrow Street, Dublin 4.

Commercial Office Fitout – Part CAT A and Cat B – over 5 floors in 3 or 4 phases, with Phase 1 been Part GF and FF.

Project Manager – Bob Gallagher – 0873330538

Site Manager – Robert carton – 0876304170

  • 2. Access and egress

Site entrance door will be open between the hours of 800am and 1900pm every morning. This door will be closed and only opened when permission has been approved by GCF Site Manager. Access to the site is gained through an off side door on the ground floor at the front entrance of the building.

  • 3. Site specific safety rules

All operatives are required to sign in/out daily via site QR code.

No works to be caried out outside unit

Suitable personal protective equipment must always be worn when on-site. As a minimum on this project, it will include a hard hat, Hi-viz vest and safety footwear.

No smoking on site

No works to start on site until all rams/spa’s/GA3/hot work permits etc. are completed

  • 4. Deliveries

All deliveries/site traffic shall be coordinated by site management team. All deliveries must be made via agreed routes only and out of working hours.

  • 5. Clean as you go

All Sub-Contractors are responsible for always keeping the site safe and tidy. If GCF management, feel this is not being adhered to on site they will action accordingly and contra charge for the cleaning of the site and any other areas of the building if necessary.

  • 6. Lock out/tag out arrangements

Please speak with GCF Site Management prior to starting any works in the building/unit.

Please treat every service as live until it has been confirmed otherwise by the management team.

  • 7. Welfare Facilities

On site welfare facilities are provided, please refer to point number 2 above.

  • 8. Sign in Station/Notice Board

Please ensure when you arrive on site you carefully read the on-site notice boards, it has all of the site-specific information you require in the event of an emergency.